Waverly Gas Producers, LLC (Waverly, VA)
| Project Type: | Direct Use |
| Start date: | 2004 |
| Capacity: | 4,300 Cubic feet per minute |
| Equipment: | Two CAT 3508 engines for compression, 23 miles of pipeline |
The benefits
- Waverly Gas Producers provides landfill gas to their end-use customer for steam production, replacing the need for natural gas.
- By replacing natural gas with landfill gas, Waverly saves its end-use customer over $1 million per year on energy bills.
- The clean energy produced by this project is the equivalent of removing approximately 87,061 vehicles* from the roads annually.
Our role
Waverly Gas Producers is located on the fifth largest landfill in the nation. The sheer size of this landfill presented real challenges in the design and installation of a wellfield and pipeline that effectively eliminate the venting of the landfill gas into the atmosphere and turn that gas into a renewable power source.
DTE Biomass Energy’s in-house expertise in engineering and project management enabled us to design and install a wellfield, install the longest dedicated Landfill Gas pipeline in the western hemisphere (23 miles) and determine the compression engines best suited to the project.
Recent expansions to the plant and wellfield have increased the gas flow to the customer by a third.
*LMOP Calculator for Emissions Reductions and Environment and Energy for Landfill Gas Energy Projects